Realignment of bridge spans is required where the girders were displaced from its original position on bearing pads. These displacements occur due to the lateral movements of bridge decks and the main reason of lateral movements is of missing/ not constructed proper shear keys. To realign the deck slabs, the girders will be place on the bearing pads. Therefore, following steps should be followed for realignment of bridge spans.
STEPS:
Welcome to Highway Bridges, where cutting-edge technology meets timeless craftsmanship in bridge construction. Explore how we’re shaping the future of infrastructure with sustainable solutions.
© 2024 – CECON | Highway Bridges, All rights reserved